VanDOOR

GENUINE SPARE PARTS

Engineered to keep your fleet moving.

Browse genuine VanDOOR spare parts for DL-6 and AluLIFT systems. Real references, real lead times, no guesswork.

active references
40+
average lead time
48 h
compatibility
DL-6 / AluLIFT

36 parts

Service plan

Three maintenance windows, no surprises

Schedule extracted from DL-6 and AluLIFT manuals. Each window lists the procedures and the references to keep on hand.

03months

Quarterly inspection

  • Full functional test (open / close full cycle).
  • Door balance check with motor disconnected.
  • Aluminium rail cleaning with damp cloth (never grease).
  • Emergency-release inspection: stainless cable, lock, sheath.

Parts concerned

06months

Tightening check

  • Re-tighten the connecting tie-rod nuts (13 mm wrench).
  • Visual check of AluLIFT traction cables.
  • Apply service sticker (maintenance traceability).
12months

Annual overhaul

  • Remove motor block, visual inspection of gears.
  • MANDATORY replacement of DL-8001254 guiding blocks (set of 4).
  • Electrical connections check (30 A fuse, battery cable corrosion).
  • Remote A23 battery, AluLIFT balancer spring tension.

Source: DL-6 manuals (FR User Manual, FR Installation Notice) and AluLIFT (Maintenance Manual).

Tools & PPE

What the installer needs on site

Consolidated list from the DL-6 and AluLIFT installation and maintenance manuals.

Mechanical & electrical tools

  • Flat-head + Phillips screwdrivers
  • 2 mm Allen key
  • 13 mm wrench (tie-rod nut)
  • Quality wire cutter (stainless cable)
  • Locking pliers / clamp
  • Tension bars (×2) for AluLIFT balancer spring
  • Large-diameter countersunk rivets (protrusion < 1.8 mm)
  • Drill + bits
  • Multimeter (12 / 24 / 32 V DC)
  • Damp cloth — never grease

Personal protective equipment

AluLIFT — Machinery Directive

  • Safety boots (steel toe)
  • Safety glasses
  • Protective gloves
  • Helmet

Heavy loads: 2-person intervention minimum. PPE mandatory on AluLIFT under Machinery Directive 2006/42/EC.

Reflejos de campo

Dos puntos clave antes que cualquier otra cosa

Procedimientos críticos para mantenerse operativo — desbloqueo de emergencia y cualificación del instalador.

  • External release procedure: (1) insert the DoorLIFT key into the lock cylinder at the centre of the intermediate or top panel, outside face; (2) turn the key 90° clockwise and firmly pull the lock and cable out of the cylinder — the system disengages; (3) reinsert the cable and cylinder into the door lock housing, then operate the door by hand. On the AluLIFT, an internal release is available: pull the red sleeve marked 'EMERGENCY DOOR RELEASE' to disengage the motor lever from inside the box.

    SRCFR---Manuel-utilisateur-DL-6.mdl.617-632 + utilisation l.420-449

  • VanDOOR does not perform installation itself. AluLIFT integration must be carried out exclusively by qualified, trained bodybuilders or integrators, in accordance with Machinery Directive 2006/42/EC and best practice. The integrator guarantees regulatory compliance of the final assembly, verifies correct operation, commissions the system, and supplies the end user with the manual and CE Declaration of Conformity for the integrated equipment.

    SRCManuel-instruction-installation.mdl.45-72