Product compatibility
Fits both DL-6 and VanDOOR AluLIFT.
Reference verified on the VanDOOR ranges below. Any out-of-scope install requires engineering validation.
Compatible range

Technical specifications
3 documented specifications
Headline spec
Length
Additional data
Product compatibility
Reference verified on the VanDOOR ranges below. Any out-of-scope install requires engineering validation.
Compatible range
Related documentation
Manuals and datasheets referenced for this part.
Order alongside
Part FAQ
The system requires a 12 or 24 V DC source rated for 65 A to absorb motor-startup peaks. The control box converts that voltage to 32 VDC ±10% to drive the two bipolar motors. Nominal running current: 5 A, with peaks up to 30 A. A 30 A fuse protects the battery cable. On trailers, plan an auxiliary supply so the system works tractor-disconnected.
SRCFR---Notice-d-installation-DL-6.mdl.89-92 + l.747-749, l.763-764
The system automatically detects under-voltage: LED 1 flashing red in operation means the input is too low. The box cuts the cycle to avoid running motors under-volted. Procedure: (1) check battery voltage (12 or 24 V depending on vehicle) and state of charge; (2) visually inspect battery-to-control-box cables for corrosion or breaks; (3) check the 30 A fuse. Poorly maintained or deeply discharged batteries may fail to run the system. On a trailer, plan an auxiliary supply when the tractor is disconnected.
SRCFR---Manuel-utilisateur-DL-6.mdl.653, 663-664
Field essentials
Critical procedures to stay operational — emergency release and installer qualification.
External release procedure: (1) insert the DoorLIFT key into the lock cylinder at the centre of the intermediate or top panel, outside face; (2) turn the key 90° clockwise and firmly pull the lock and cable out of the cylinder — the system disengages; (3) reinsert the cable and cylinder into the door lock housing, then operate the door by hand. On the AluLIFT, an internal release is available: pull the red sleeve marked 'EMERGENCY DOOR RELEASE' to disengage the motor lever from inside the box.
SRCFR---Manuel-utilisateur-DL-6.mdl.617-632 + utilisation l.420-449
VanDOOR does not perform installation itself. AluLIFT integration must be carried out exclusively by qualified, trained bodybuilders or integrators, in accordance with Machinery Directive 2006/42/EC and best practice. The integrator guarantees regulatory compliance of the final assembly, verifies correct operation, commissions the system, and supplies the end user with the manual and CE Declaration of Conformity for the integrated equipment.
SRCManuel-instruction-installation.mdl.45-72